Commit dc5823

2026-06-13 08:34:42 muragami: Rewrite resolution
regulus/job resolution.md ..
@@ 229,9 229,22 @@
## The Job Record Sheet
- The Job record sheet created by the Director is a turn by turn record sheet for all the incidents that happened across the job. It is a series of lines with columns for: Incident, Progress, Negative Outlook (trouble). Positive Outlook (opportunity), and notes for stuff like consequence, crew loss, value, etc.
+ The Job record card created by the Director is a turn-by-turn record of all incidents that occurred across the job. It is a series of lines with columns for: Incident, Progress, Negative Outlook (trouble). Positive Outlook (opportunity), and notes for stuff like consequence, crew loss, value, etc.
- The lead operative rolls 2d6 to determine incidents which the Director records until the job concludes: either the deadline is met, progress hits -3, progress meets or exceeds difficulty, or all crew is lost.
+ The lead operative rolls 2d6 to determine incidents, which the Director records until the job concludes in one of the following ways:
+
+ * The deadline has been met; see Clocked below.
+ * Progress hits -3; see Botched below.
+ * Progress meets or exceeds weight; see Success below.
+ * The entire crew is lost; see Totaled below.
+
+ #### > Botched
+
+ #### > Clocked
+
+ #### > Success
+
+ #### > Totaled
## Unwinding the Job
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9